PLN Gambir

  • country
  • customer
    PT INPAR SAKA
  • end customer
    PT PLN

PLN Gambir

  • In this project, the legacy communication system was to be overhauled and modernized. The first stage involved the installation of a new RTU, which acts as a data concentrator for the existing RTUs. In the second stage, a new control station was to speed up communication.

    Realization of the first stage requires two ipConv protocol converters for each system.
    Protocol converter #1 is needed for coupling the new RTU with the legacy control station. Protocol converter #2 connects the legacy RTUs with the new RTU (data concentrator).
    The control station and the legacy RTUs communicate over the HN Z 66-S-11/15, T63 protocol, while DNP 3.0 is used for communication with the new RTU.

    Background

    Before the legacy HNZ control station is replaced (2nd stage), the new RTU technology needs to be tested.
    During this test phase, both converters are needed.
    After initialization of the 2nd stage, the new control station is to communicate directly with the RTU via DNP 3.0.

     

    The operator of the installation is the Indonesian utility provider PT PLN (Perusahaan Listrik Negara).
    Total annual energy consumption from 1997 to 2001 amounted to 64 GWH and 84 GWH respectively, delivered to these end consumers :

    Private households: approx. 39 %
    Commerce: approx. 14 %
    Industry: approx. 42 %
    Others: approx. 5 %
Used Products
  • ipConv
    ipConv

    Universal protocol converter for highest degree of flexibility

Used Protocol Stacks

DNP V3.00, Slave

DNP V3.00, Master

HN Z 66 S 11/15, T63, Slave

HN Z 66 S 11/15, T63, Master